This was a fairly simple job. The customer brought the bellhousung to us with the Aluminium block clamped in position. This was needed to attach a non-standard clutch release mechanism. The parts were in a nice clean condition, so it was a case of switch the TIG welding machine on, turn up the amps (about 200 to start with), put 3 big tack welds on to hold the block in position, remove the clamp & weld around the join. It needed to be repositioned several times & access was tight in some places, but we managed to weld all the way around the block for a good strong join.